BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

01 / 29

Independent investment and delivery plan

FeasibilityStudy

Halden Wyke Consulting

From a survey instruction or a framework call-off to an approved, issued document.
A clear plan for the systems, people and decisions in between.

Business priorities
Systems and processes
Independent assessment
Delivery plan

Your team chooses the route

Company-wide context

Everyday systems and information.

Two end-to-end reviews

Client reporting and Bids and proposals.

Three delivery routes

Training, custom builds and the Efficiency Programme.

Prepared for Halden Wyke Consulting. Commercial in confidence. Version 1.0, 2026-09-16.
Commercial in confidence.Cover · 01

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

02 / 29

The decision

Start with client reporting.Build from there.

A staged plan for Halden Wyke Consulting, not a company-wide technology replacement.

Recommended route

Efficiency Programme

Two or more builds are worth making and the team needs capability alongside them, so one coordinated programme avoids paying twice for the same foundations.

Keep professional judgement

The assistant prepares and flags. Your team approves.

Keep the existing systems

Improve the handovers, not the whole estate.

Release senior capacity

Assign it to client delivery and review.

£10,000

per month + VAT

Six months · £60,000 total supplier fee

£219.3k

modelled first-year capacity value

Against £141,600 of total resource cost

The value is employment-cost equivalent, not cash profit. The modelled resource cost is recovered in month 8. Model and sensitivities are in Appendix B.

Training

£36,000

12 tailored days. The team applies approved tools.

Custom-Built Systems

£47,000

2 defined builds with handover, plus the training day.

Fees exclude VAT. Each route is complete and usable on its own.

Commercial in confidence.Decision summary · 02

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

03 / 29

Scope and evidence

Broad context.Two complete process reviews.

One light business-wide review, followed by the selected areas from their true start to finish.

Light review · company-wide

Microsoft 365Excel and spreadsheetsRevit and AutoCADSharePoint document storeAccounts systemExisting AI use

The everyday systems, ownership, restrictions and information routes around the selected processes.

Deep-dive area

Client reporting

confirm → collect → record → prepare → check → issue

Start: An agreed survey or reporting instruction.
Finish: An approved, issued report.

Deep-dive area

Bids and proposals

capture → qualify → read → prepare → review → submit

Start: A framework call-off or a client enquiry.
Finish: A submitted response, or a recorded loss.

Evidence behind the assessment

People

Operations sponsor, reporting lead, bid lead, document owner and system owner.

Records reviewed

Process accounts, approved templates, workload records and the tool inventory.

Scope boundary

No finance-process deep dive, no technical or design review, no enterprise IT audit.

Assessment only. No solution testing. No prototypes, builds, integrations or live configuration form part of the study. Future performance remains forecast until checked during paid delivery.

3 evidence modules are active for this study; they are listed in Appendix D.

Commercial in confidence.Scope · 03

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

04 / 29

The operating picture

Improve the handovers.Keep the core systems.

The friction sits between existing tools: information is gathered and checked again for each output.

Business

Building surveying, project management and cost consultancy

Delivery

Fee-based professional appointments

Team in scope

160 people in Manchester, Leeds and London

Client reporting

Microsoft 365, approved report templates

Site records, drafts and issued reports

Bids and proposals

Microsoft 365, approved bid library

Call-off briefs, responses and submissions

Documents and knowledge

SharePoint, project folders

Approved material and versioned records

Commercial and finance

Accounts system, Excel

Fees, costs and management information

Technical production

Revit, AutoCAD

Drawings and measured information

Team AI use

Company-approved tools

Occasional use by a few people, no agreed rules

Deep-dive areaContext review only


Retain

Approved report and bid templates, reviewer sign-off and the existing project record.

Resolve first

Document ownership, current versions, and what client material may be used in an approved tool.

Before either build: Name each document owner, record the current version and permitted use, and confirm that no client or confidential information leaves the approved tenant.

System inventory as described by the client. No integration has been tested in this study.

Commercial in confidence.Operating picture · 04

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

05 / 29

Priorities

Put preparation first.

Start with recurring effort and controlled information. Reuse the same foundations in the next area.

NOW

First priority

Client reporting

Organise site evidence and draft the report with sources. The surveyor retains findings and approval.

W01 · largest recurring preparation workload · document controls first

NEXT

Second priority

Bids and proposals

Draft from the stated requirements and current approved material. The director retains fees and terms.

W02 · builds on the same approved document library

LATER

Not commissioned

Fees and management reporting

A later review, outside the two assessed areas. No extra build or benefit is included.

Beyond the two assessed areas · separate decision required


Alongside implementation

Practical team training, followed by workflow-specific handover when each build is ready.

What not to automate

Professional findings

Do not let a draft infer survey conclusions or repair advice.

Commercial authority

Do not let a draft set fees, accept terms or make promises to a client.

Useful now: Name each document owner, record the current version and permitted use, and confirm that no client or confidential information leaves the approved tenant.
Commercial in confidence.Priorities · 05

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

06 / 29

Client reporting · current state

From an agreed survey or reporting instructionto an approved, issued report.

Turn a survey instruction into an approved, issued report.

01

Project lead

Confirm the instruction

Record the agreed reporting purpose, estate and output.

02

Coordinator

Collect the records

Gather estate records, prior reports and current versions.

Version hunting

03

Surveyor

Record the findings

Capture site notes, observations and photograph references.

04

Surveyor

Prepare the report

Assemble evidence and draft into the approved format.

Repeated collation

05

Reviewer

Check and approve

Resolve gaps, validate findings and approve the report.

Gaps found late

06

Coordinator

Issue and archive

Send the approved version and retain the issue record.

Full inputs, outputs, controls and exception routes: Appendix A.

9

reports each week

Recurring workload across commercial, education and healthcare estates

125 h

current team effort / week

Collection, drafting and review

10

people in this workflow

3 coordinators, 6 surveyors, 1 reviewer

Evidence is fragmented before the draft begins. Earlier gap detection should reduce repeated collation, not replace observation or judgement.

What already works well: The issued report is a controlled record, and every amendment gets its own version.

Commercial in confidence.Client reporting · current · 06

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

07 / 29

Client reporting · proposed state

A traceable findings draft that preserves the chain from site evidence to professional conclusion.

Records are organised into the approved format, sources stay traceable and gaps are visible before professional review.

Survey records and photographs
Approved report templates
Survey record assistant
Referenced findings draft

Surveyor reviews and approves

Keep human

Survey findings, technical conclusions, recommendations and permission to issue.

Deliver

One report template, a source list, a gap register and a controlled review handover.

1,650 h

annual capacity released

Modelled steady use

£79,200

annual capacity equivalent

Not a cash saving · model in Appendix B

37.5 hours released each active weekof 125 current team hours

W01 · fixed build fee £6,000 + VAT. No photograph diagnosis, no technical calculations, no autonomous client commitments, no replacement of the responsible professional.

Commercial in confidence.Client reporting · proposed · 07

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

08 / 29

Bids and proposals · current state

From a framework call-off or a client enquiryto a submitted response, or a recorded loss.

Turn a framework call-off into a compliant submission or a recorded loss.

01

Coordinator

Capture the call-off

Log the call-off, the client and the return date.

Incomplete records

02

Bid lead

Qualify the fit

Confirm service, deadline and a reason to pursue.

03

Bid lead

Read the requirements

Extract the compliance, quality and pricing requirements.

Repeated chasing

04

Coordinator

Prepare the response

Assemble approved material against each requirement.

Repeated drafting

05

Director

Review and authorise

Check compliance, fee, terms and delivery capacity.

Approval queue

06

Bid lead

Submit and close

Submit, follow up and record the award or the loss.

Full inputs, outputs, controls and exception routes: Appendix A.

5

call-off responses each week

Recurring framework workload

70 h

current team effort / week

Requirement reading, drafting and review

6

people in this workflow

2 coordinators, 3 bid and technical staff, 1 director

The same approved material is assembled against similar requirements every week. A controlled library comes before assisted drafting.

What already works well: Director authorisation is consistent and every submission is recorded against its call-off.

Commercial in confidence.Bids and proposals · current · 08

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

09 / 29

Bids and proposals · proposed state

A complete first response against the stated requirements.With the commercial decision left with the director.

A draft starts from the actual requirements, flags missing inputs and reuses only approved material. The bid lead still submits and follows up.

Call-off brief and requirements
Approved bid library
Call-off bid assistant
Referenced response draft

Director reviews and approves

Keep human

Scope, fees, exclusions, terms, capacity commitments and final submission.

Deliver

One response template, approved source references and a missing-input list.

792 h

annual capacity released

Modelled steady use

£38,016

annual capacity equivalent

Not a cash saving · model in Appendix B

18 hours released each active weekof 70 current team hours

W02 · fixed build fee £6,000 + VAT. No new bid system, no data migration, no historic archive cleansing, no portal automation.

Commercial in confidence.Bids and proposals · proposed · 09

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

10 / 29

Training and adoption

Useful capabilityacross the team.

Practical habits around everyday tasks and approved tools, without weakening professional checking.

Tailored cohort

120people

12 cohorts · 1 practical day each

  • Client correspondence
    Draft, check and adapt to context
  • Meeting notes and actions
    Turn approved notes into clear actions
  • Spreadsheet checking
    Check figures and explain differences

£36,000

+ VAT · tailored · 12 cohorts of up to 10

8.6 min

net daily improvement per active person to cover the resource cost in year one

Per active person, at the modelled first-year ramp

Different roles. Relevant application.

PeoplePractical focus
Coordination and supportClear correspondence, accurate actions and dependable checking.
Surveyors, project and cost staffSource-led routine analysis and explanations within their authority.
Separate benefits: General training excludes report and call-off preparation. Workflow-specific training is delivered at handover.

Adoption conditions: An internal sponsor, protected attendance, the company's own material and a named follow-through owner. Resource-cost break-even, not a cash saving.

Commercial in confidence.Training · 10

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

11 / 29

The commercial case

Value depends on use.Not just installation.

The programme model counts separate tasks once and includes the cost of participating.

£219.3k

year-one capacity value

Modelled employment-cost equivalent

£141,600

year-one resource cost

Fees, tools and internal participation

Capacity value£219,318
Total resource cost£141,600

Resource benefit / cost

1.55×

Modelled resource-cost recovery

Month 8

Month 8 Month 0Month 12 £77.7k−£30.6k

Cumulative capacity value less resource cost. This is not a cash-flow chart or a cash payback claim.

Lower use changes the decision. 50% steady effective use: At half the modelled use, the first-year value falls well below the modelled case. Modelled first-year value would be £109,659 against the same £141,600 cost.

Benefit classes and the assumption record sit in Appendix B, with the inputs that produce them.

Commercial in confidence.Investment case · 11

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

12 / 29

Fixed-price delivery routes

Three ways to proceed.

Each route has defined inclusions. The independent study remains useful whichever route is selected.

Recommended

Coordinated route

Efficiency Programme

£10,000+ VAT per month

Six-month minimum · £60,000 + VAT total supplier commitment

Committed scope

Survey record assistant, Call-off bid assistant, 12 tailored training days and workflow handover.

Support and improvement

10 days a month across delivery, training, support and improvement, for six months.

No additional mobilisation fee. New workflows are not included. Software, hosting and client time are separate.

Custom-Built Systems

  • W01 · Survey record assistant£6,000
  • W02 · Call-off bid assistant£6,000
  • All defined builds£11,000 + VAT

Design, build, implementation testing, handover training and 30 days of defect correction. General team training and ongoing improvement are not included.

Standalone training

Tailored · 12 days · cohorts of up to 10 · 120 people

Practical team capability. No workflow build or continuing consultancy. A basic untailored day is available at £2,000 per cohort.

£36,000+ VAT

These are alternatives, not additive package fees. Training is already included in the Efficiency Programme.

Commercial in confidence.Fixed prices · 12

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

13 / 29

Implementation path

A sequence with owners.Not a list of AI ideas.

Complete the shared foundations once, then release each workflow only after its own acceptance.

NOW

Months 1–2

Prepare the team and the source material

Agree approved templates, source ownership and access rules. Begin the tailored training cohorts. Start the reporting build.

Client: Operations sponsor and document owners.
Dependency: Approved material, named reviewers and confirmed tenant rules.

NEXT

Months 3–4

Release the reporting workflow

Complete testing and acceptance, train the users at handover and begin controlled use. Start the call-off build.

Client: Reporting lead accepts the output and the controls.
Dependency: Acceptance before general use.

LATER

Months 5–6

Release call-off responses and improve both

Accept the call-off workflow, complete handover and use the included improvement allocation. Decide who owns operation after month six.

Client: Bid lead and system owner.
Dependency: A documented operating and support arrangement.


Reviews and included allocation

Track use, corrections, released capacity and client decisions. Agree changes within the included allocation of 10 days a month, not an unlimited backlog.

First actions: Name the sponsor and process owners, confirm the approved templates, then select the route and scope.

Design, building and acceptance take place later under paid delivery, not within this study.

Commercial in confidence.Implementation · 13

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

14 / 29

Your decision pack

Enough detail to act.No dependence on us.

The independent plan is separate from Built Logic's supplier prices and any later appointment.

The plan is yours to use.

Use the plan with Built Logic, your own team or another provider. The requirements, assumptions and acceptance checks stand on their own.

Process records

What happens today, who acts, where the handovers fail and what stays unchanged.

Appendix A

Investment model

Inputs, calculations, rollout, costs and the distinction between capacity and cash.

Appendix B

Delivery brief

Included outputs, exclusions, controls, ownership and future acceptance.

Appendix C

Evidence and assumptions

What supports each finding, what is modelled and what still needs confirmation.

Appendix D

Your next decision

Agree who will own delivery and ongoing operation. Compare any provider against the same defined scope, not only the headline fee.

The delivered package includes an editable calculations and requirements workbook alongside this report.

Commercial in confidence.Portable handover · 14

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

15 / 29

Appendix A1 / Process record

Client reporting.

The numbered stages link to the current and proposed process pages.

Stage and roleInput → outputException or control
R01 · Confirm the instruction
Project lead
Accepted instruction → Purpose, scope and report typeA new instruction requires a controlled scope change.
R02 · Collect the records
Coordinator
Client and project files → Indexed evidence setMissing, conflicting and superseded material is recorded. (Version hunting)
R03 · Record the findings
Surveyor
Site visit and records → Professional notes and photograph referencesNo tool substitutes for observation or diagnosis.
R04 · Prepare the report
Surveyor
Approved notes and evidence → Draft, source list and gapsUnsupported content stays a gap for review. (Repeated collation)
R05 · Check and approve
Reviewer
Draft and underlying records → Approval or correctionsProfessional conclusions and sign-off remain human. (Gaps found late)
R06 · Issue and archive
Coordinator
Approved version → Issue record and archiveA later amendment gets a new version and a new review.

Baseline and proposed effort

Team effortCurrentModelled at steady use
Instruct, collect and record50 hSource checking and survey judgement retained
Draft, review and issue75 hCollation reduced; professional review retained

Net release: 37.5 hours released each active week · 1,650 h a year.

Boundary: The issued report is the approved record. Remedial design and subsequent delivery are outside this build.

Variants: Condition surveys, dilapidations and project reports share one approved family of templates. Excluded: Remedial design, technical calculations and subsequent project delivery are outside this assessment.

Commercial in confidence.Appendix A · 1 · 15

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

16 / 29

Appendix A2 / Process record

Bids and proposals.

The numbered stages link to the current and proposed process pages.

Stage and roleInput → outputException or control
S01 · Capture the call-off
Coordinator
Call-off brief → Logged opportunity and sourceA duplicate call-off is linked, not counted twice. (Incomplete records)
S02 · Qualify the fit
Bid lead
Logged opportunity → Pursue or decline decisionCapacity, service fit and any conflict are recorded.
S03 · Read the requirements
Bid lead
Call-off documents → Requirement list and missing inputsAn incomplete brief returns to the owner; no invented facts. (Repeated chasing)
S04 · Prepare the response
Coordinator
Requirements and approved library → Draft response and referencesOnly approved versions and permitted reference material. (Repeated drafting)
S05 · Review and authorise
Director
Draft and commercial inputs → Approval or required changesScope, fee and terms are human decisions. (Approval queue)
S06 · Submit and close
Bid lead
Approved submission → Award or recorded lossChanged scope reopens qualification and approval.

Baseline and proposed effort

Team effortCurrentModelled at steady use
Capture, qualify and read28 hWithin the retained human process
Prepare, review and submit42 hPreparation reduced; review retained

Net release: 18 hours released each active week · 792 h a year.

Boundary: An awarded call-off passes to mobilisation. Project delivery is outside this build.

Variants: Two response variants share one approved bid library; repeat clients skip qualification. Excluded: New framework applications and open public-sector portal tenders are outside this assessment.

Commercial in confidence.Appendix A · 2 · 16

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

17 / 29

Appendix B1 / Capacity model

Every hour has a source.

Each benefit line is produced by the shared calculation engine from the inputs below.

Benefit lineHours a yearCapacity valueBasis
Report preparation capacity1,650 h£79,200Released capacity at employment cost
Call-off response capacity792 h£38,016Released capacity at employment cost
Everyday task capability3,300 h£158,400Released capacity at employment cost, excluding the two build workloads
Net capacity: eligible periods × net hours released × effective use, less any additional support hours. Values are the employment-cost equivalent of those hours.

Total hours a year

5,742 h

Total capacity value

£275,616

Separate ledgers

LedgerSteady yearHours a yearFirst yearBasis
Released capacity£275,6165,742 h£219,318Employment-cost equivalent of released hours. Not cash.

Benefit classes

BenefitClassBasis
Report preparation capacityOperationalEmployment-cost equivalent, not cash
Call-off response capacityOperationalEmployment-cost equivalent, not cash
Everyday task capabilityOperationalEmployment-cost equivalent, not cash

Training excludes the assessed build workloads. Shared costs are counted once. Recovery is a resource-cost recovery, not a cash payback.

Commercial in confidence.Appendix B · 1 · 17

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

18 / 29

Appendix B2 / Training model

The cost of participation.

The supplier fee is only one part of the resource cost. Existing capability and licences change the incremental case.

First-year resource costBasisAmount
Supplier feeTailored tariff, cohorts of ten£36,000
AttendanceActual attendance schedule£43,200
PracticeIncluded practice hours£5,760
Internal mobilisationClient preparation£1,920
Incremental licencesPer person per month£28,800
Internal supportMonthly support hours£1,152
TotalNot all supplier cash spend£116,832

7.4 min

steady-use break-even

Net daily improvement per active person

8.6 min

first-year break-even

Same costs, with the recorded rollout

A model, not a claim. Time, use, cost and licence inputs are assumptions. No cash saving is established. Recoverable VAT is excluded.
Commercial in confidence.Appendix B · 2 · 18

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

19 / 29

Appendix B3 / Programme model

One count of each cost.

Supplier cash, external running costs and internal resource are counted separately and once.

Year-one investmentCash or resourceAmount
Six monthly Efficiency Programme feesSupplier cash£60,000
Approved assistant licences and workflow running costs for the people in scope, paid to the software suppliers, not to Built Logic.External running cost£28,800
Client mobilisation, acceptance, training attendance and in-house support in the first twelve months.Internal resource£52,800

Total first-year resource cost

£141,600

Prices exclude VAT

Recoverable VAT is excluded throughout

Assumption discipline

CategoryWhat it covers
Based on supplied evidenceActivity counts, team effort and the finance-approved employment cost basis.
Management estimateCurrent effort by stage, confirmed by the area owners.
Model assumptionSteady effective use, the monthly rollout and the retained review effort.
Not yet provenNo proposed change has been built, tested or measured in this study.
No overlap: Training excludes the assessed build workloads. Shared costs are counted once. Recovery is a resource-cost recovery, not a cash payback.
Commercial in confidence.Appendix B · 3 · 19

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

20 / 29

Appendix B4 / Rollout and horizons

Benefit arrives on a ramp.

Monthly fractions of the steady-use case, and the same model read over three horizons.

Benefit lineM1M2M3M4M5M6M7M8M9M10M11M12
Report preparation capacity0%0%50%75%100%100%100%100%100%100%100%100%
Call-off response capacity0%0%0%0%50%75%100%100%100%100%100%100%
Everyday task capability0%50%75%100%100%100%100%100%100%100%100%100%

Resource view by horizon

View6 months12 months24 months
Capacity value£81,510£219,318£494,934
Resource cost£100,800£141,600£223,200
Net resource balance−£19,290£77,718£271,734

Recovery is a resource-cost recovery, not a cash payback. A second adoption discount is not applied on top of the ramp.

Commercial in confidence.Appendix B · 4 · 20

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

21 / 29

Appendix C1 / Delivery brief

The delivery boundary.

A common business brief another competent provider can assess, without a prescribed engineering method.

Included boundaryW01 · Survey record assistantW02 · Call-off bid assistant
Company and usersOne UK entity; ten authorised users.Same entity; six authorised users.
Volume envelopeUp to 40 reports a month.Up to 25 call-off responses a month.
InputText-based records, survey notes and supplied photograph references.A structured call-off brief and approved, text-based material.
OutputOne agreed report template, source register and gap list.One agreed response template, source register and missing-input list.
VariationsOne reporting family using the same approved templates.Two response variants using the same approved library.
Information transferThe user supplies authorised files inside the tenant. No automatic external issue.The user supplies authorised files inside the tenant. No portal write-back.
Human authorityObservations, conclusions, advice and approval.Scope, fee, terms and approval.
Commercial in confidence.Appendix C · 1 · 21

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

22 / 29

Appendix C1 / Delivery brief, continued

What is excluded.

Each build carries its own exclusions alongside the shared boundary.

Common exclusions

W01 · Survey record assistant

No photograph diagnosis, no technical calculations, no autonomous client commitments, no replacement of the responsible professional.

W02 · Call-off bid assistant

No new bid system, no data migration, no historic archive cleansing, no portal automation.

Inputs and source ownership are part of scope. The client names the template and source owners, supplies authorised current material and confirms approved access. Unsupported or missing inputs are routed to review, not filled by guesswork.
Commercial in confidence.Appendix C · exclusions · 22

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

23 / 29

Appendix C2 / Acceptance and handover

What acceptance requires.

Quality, control and ownership are separate from the hoped-for speed improvement.

Acceptance requirementFuture evidenceDecision owner
Every factual statement carries its source.Inspect source references across the agreed case set.Reporting lead
Gaps are raised before professional review.Incomplete and conflicting evidence cases.Reporting lead
Client and confidential material stays inside the approved tenant.Access checks and denied-access cases.System owner
Professional conclusions are never generated.Review the agreed case set for substituted judgement.Responsible reviewer
Failure has a usable manual route.Demonstrate a failed run, recovery and the normal manual process.Operations sponsor
Only authorised source material is accessible.Role-based access checks and denied-access cases.System owner
Factual draft content is traceable to a supplied source.Review of the agreed case set and inspection of source references.Bid lead
Missing or conflicting requirements are visible.Incomplete, conflicting and revised-document cases.Bid lead
No response is submitted without human authorisation.Demonstrate approval and submission controls.Director

Ownership and support

Project route

Handover training and 30 days of in-scope defect correction. New features and continuing operation are separate.

Efficiency Programme route

The same deliverables plus 10 days a month across improvement, support and reviews over the minimum term. No unlimited backlog.

These are future implementation checks, not tests performed during the study.

Commercial in confidence.Appendix C · 2 · 23

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

24 / 29

Appendix D / Source and assumption record

Sources and assumptions.

What supports each finding, what is modelled and what still needs confirmation.

IDSource and role
B1Benefits and Investment Case Master v0.2 — Supplied methodology, classifications, training terms and calculation rules.
D1Kristian, 13 September 2026 grill record — Decisions D1 to D12: rates, day rubric, tariffs, bands, route rule, study fee.
H1Halden Wyke Consulting engagement record, September 2026 — Company picture, systems, workload bands and restrictions. Every figure is a stated working assumption.
H2Halden Wyke Consulting AI Action Plan, September 2026 — The two selected areas, the training scope and the route this study is measured against.

Evidence modules applied

M02 Tender review, estimating and submission; M07 Engineering, surveying and professional-service delivery; M12 Shared knowledge, document search and repeatable drafting

What is not established here

Commercial in confidence.Appendix D · 24

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

25 / 29

Appendix D / Outstanding record

What is still open.

Each item names its owner and what it affects. A blocking item stops that commitment, not the rest of the study.

Outstanding record

IDOutstandingOwnerEffect
gap.G01Recorded rework or revision rate for issued reports and submitted responses. A quality benefit cannot be claimed without a baseline.Reporting leadNo rework benefit is claimed in the commercial case

Fixed fees exclude VAT. The study fee is £2,000 with a £500 deposit, recorded separately from the delivery routes.

Commercial in confidence.Appendix D · outstanding · 25

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

26 / 29

Appendix D / Presentation contract

Every visual has a record.

Each element of the report links back to the record and the calculation that produced it.

IDRecordWhat this study showsSource
VIS01Report and reference identityHalden Wyke Consulting, version 1.0, issuedregister identity and issue gate
VIS02Reading order and content coverage2 assessed areas across the main report and four appendicespage order
VIS03Process diagram nodes and edgesW01, W02 source-to-output diagramsdelivery records
VIS04Controls and detailed process links12 stages with their controls in Appendix Aprocess stage records
VIS05Displayed result and provenance3 benefit lines, each naming its engine call and classificationbenefits engine results
VIS06Chart semantics and geometryCumulative resource balance over 13 monthly points, axis −£30.6k to £77.7kcashInvestment series
VIS07Commercial route display3 priced routes, recommended Efficiency Programmecalculator fees
VIS08Training and roadmap graphics12 cohorts and 3 roadmap steps with ownerstraining and roadmap records
VIS09Supporting detail and export mapping2 process records, 9 acceptance rows, editable workbook deliveredappendices and workbook
VIS10Access and rendering state3 active modules; private records excluded before renderingclient-safe filter

Derived from the prepared study. No visual carries a figure that is not in the record behind it.

Commercial in confidence.Appendix D · presentation · 26

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

27 / 29

Appendix D / Result provenance

Where each figure comes from.

Result and method version, evidence, classification, unit, cohort, baseline, period and scenario.

Visual and resultMethod and evidenceClassification and unitCohort and baselinePeriod and scenario
VIS05 · benefit.B01study-method-2026-09-13
process.P09, process.P10, benefit.V04
Released capacity at employment cost
GBP a year, employment-cost equivalent
Client reporting: 10 people in the workflow
44 eligible periods at 50 hours
First twelve months from engagement start, on the recorded rollout
Steady effective use 75%; 1,650 h released; overlap report-hours
VIS05 · benefit.B02study-method-2026-09-13
process.P09, process.P10, benefit.V04
Released capacity at employment cost
GBP a year, employment-cost equivalent
Bids and proposals: 6 people in the workflow
44 eligible periods at 24 hours
First twelve months from engagement start, on the recorded rollout
Steady effective use 75%; 792 h released; overlap call-off-hours
VIS05 · benefit.B03study-method-2026-09-13
training.L01, training.L05, benefit.V04
Released capacity at employment cost, excluding the two build workloads
GBP a year, employment-cost equivalent
120 people across 12 cohort(s)
220 eligible days per person
First twelve months from engagement start, on the recorded rollout
Steady effective use 75%; 3,300 h released, break-even 7.4 min a person a day; overlap training-hours
VIS06 · commercial.seriesstudy-method-2026-09-13
benefit.B01, benefit.B02, benefit.B03
Cumulative capacity value less resource cost
GBP, cumulative
160 people in Manchester, Leeds and London
Zero at month 0
Month 0 to month 12
Line chart, common scale −£30.6k to £77.7k, zero and negative shown
Commercial in confidence.Appendix D · provenance · 27

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

28 / 29

Appendix D / Result provenance, continued

Where each figure comes from.

Result and method version, evidence, classification, unit, cohort, baseline, period and scenario.

Visual and resultMethod and evidenceClassification and unitCohort and baselinePeriod and scenario
VIS07 · route.partnershipstudy-method-2026-09-13
company.C06, delivery.D14
Fixed monthly fee, six-month minimum
GBP a month, excluding VAT
120 people in scope
10 days a month from the band
6 months, total £60,000
Rate £1,000 a person-day; capacity within-capacity
VIS07 · route.workflowsstudy-method-2026-09-13
process.P03, process.P07, process.P18, delivery.D03 | process.P03, process.P07, process.P09, delivery.D03
Fixed build fees
GBP one-off, excluding VAT
W01, W02
11 days after shared handover
One-off, on acceptance
Shared handover removed once (1 day(s))
VIS07 · route.trainingstudy-method-2026-09-13
training.L01, training.L04
Tailored training tariff
GBP per cohort, excluding VAT
120 people in 12 cohort(s) of up to 10
£3,000 a cohort
One-off
Kristian, 13 September 2026 grill, decisions D2 and D7
VIS08 · training.cohortsstudy-method-2026-09-13
training.L01, training.L04, training.L05
Cohort and capability plan
people and days
120 people, 1 day(s) a cohort
2 role groups
Delivered before and at handover
Included in the recommended route
Commercial in confidence.Appendix D · provenance continued 1 · 28

BUILT LOGIC

Halden Wyke Consulting

Feasibility Study

29 / 29

Appendix D / Result provenance, continued

Where each figure comes from.

Result and method version, evidence, classification, unit, cohort, baseline, period and scenario.

Visual and resultMethod and evidenceClassification and unitCohort and baselinePeriod and scenario
VIS08 · roadmap.Nowstudy-method-2026-09-13
delivery.D10, delivery.D12
Action with owner and dependency
phase
Operations sponsor and document owners.
Approved material, named reviewers and confirmed tenant rules.
Months 1–2
Committed within the recommended route
VIS08 · roadmap.Nextstudy-method-2026-09-13
delivery.D10, delivery.D12
Action with owner and dependency
phase
Reporting lead accepts the output and the controls.
Acceptance before general use.
Months 3–4
Committed within the recommended route
VIS08 · roadmap.Laterstudy-method-2026-09-13
delivery.D10, delivery.D12
Action with owner and dependency
phase
Bid lead and system owner.
A documented operating and support arrangement.
Months 5–6
Uncommissioned until the prior phase is accepted