Built Logic

See what AI can do

Approved body factory audit date to closed findings

We take off your hands: getting your production control, test, material and training records in one place. Doing it before the visit. Closing each finding after it.

You get: test, material and staff records ready for the visit. Findings tracked to close with proof. For your quality manager.

Get a price for this

Or check first: Are we ready for AI?

The problem

Before the audit, the records all exist somewhere. It takes our quality manager two weeks to find them.

How the steps join up

It starts when: the approved or notified body confirms a date. It is the date of its factory production control surveillance visit.

  1. Keep factory production control records audit-ready for the approved body visit, including EN 1090 for steel fabricators

  2. Chart factory and quarry test results and warn when a product drifts towards its limits

  3. Collect and match supplier material certificates to each delivery

  4. Keep the training and competence matrix current, with expiry alerts

  5. Raise NCRs from site, find the root causes and track them to close

    Your team checks and decides at this step.

  6. Spot repeat defects from non-conformance and rework records

  7. Prepare the evidence for ISO 9001, 14001 and 45001 audits

    Your team checks and decides at this step.

One more step, which a call confirms.

What you end up with: Production control, test, material and competence records ready before the visit. Test trends shown. Any findings, including from a failed audit, tracked as defect reports. Each closed with evidence before the deadline.

Who signs it off: Your quality manager owns the audit. Your technical director signs the pack that closes it. The approved body still has the say on your certificate.

What it needs to work

  • Production control records we can reach
  • Access to your past audit reports

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Manufacturers and suppliers

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Approved body factory audit date to closed findings

Before, by hand

Get the records ready

Raise and close findings

01Keep factory production control records audit-ready for the approved body visit, including EN 1090 for steel fabricators

  • Index records to FPC clauses
  • Check dates and frequencies
  • List gaps and expired items
  • Build the audit pack
  • Fill the gaps
  • Sign the DoP

02Chart factory and quarry test results and warn when a product drifts towards its limits

  • Plot results on control charts
  • Apply the trend rules
  • Flag drift early
  • Link drift to source or mix
  • Draft the monthly summary
  • Decide on any drifting product

03Collect and match supplier material certificates to each delivery

  • Read each certificate
  • Match it to order and batch
  • Flag missing or wrong certs
  • File the linked records
  • Hold or release the material

04Keep the training and competence matrix current, with expiry alerts

  • Read each card and certificate
  • Update the matrix
  • Send expiry reminders
  • List training gaps
  • Check cards are real
  • Book the training

05Raise NCRs from site, find the root causes and track them to close

  • Draft the NCR from photos and notes
  • Route it and track it
  • Sort each one by cause
  • Spot trends each quarter
  • Agree the fix and root cause
  • Confirm it is closed

06Spot repeat defects from non-conformance and rework records

  • Read each defect note
  • Link it to product and station
  • Work out the cost
  • Confirm the root cause
  • Agree the fix
  • Track if the fix works

07Prepare the evidence for ISO 9001, 14001 and 45001 audits

  • Map each clause to evidence
  • Check records are in date
  • List open actions and gaps
  • Compile the pack
  • Answer the auditor
  • Sign off the pack

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Get the records ready

Raise and close findings

01Keep factory production control records audit-ready for the approved body visit, including EN 1090 for steel fabricators

  • AI reads and drafts: Index records to FPC clauses
  • Automated: Check dates and frequencies
  • Automated: List gaps and expired items
  • Automated: Build the audit pack
  • Your team decides: Fill the gaps
  • Your team decides: Sign the DoP

Passes on: the FPC records, gathered and checked for gaps, EN 1090 too

02Chart factory and quarry test results and warn when a product drifts towards its limits

  • Automated: Plot results on control charts
  • Automated: Apply the trend rules
  • Automated: Flag drift early
  • AI reads and drafts: Link drift to source or mix
  • AI reads and drafts: Draft the monthly summary
  • Your team decides: Decide on any drifting product

Passes on: a chart of test results, with any drift to the limits explained

03Collect and match supplier material certificates to each delivery

  • AI reads and drafts: Read each certificate
  • AI reads and drafts: Match it to order and batch
  • AI reads and drafts: Flag missing or wrong certs
  • Automated: File the linked records
  • Your team decides: Hold or release the material

Passes on: each delivery in the sample, matched to its cert

04Keep the training and competence matrix current, with expiry alerts

  • AI reads and drafts: Read each card and certificate
  • Automated: Update the matrix
  • Automated: Send expiry reminders
  • Automated: List training gaps
  • Your team decides: Check cards are real
  • Your team decides: Book the training

Passes on: a check that all your staff are trained and in date

05Raise NCRs from site, find the root causes and track them to close

  • AI reads and drafts: Draft the NCR from photos and notes
  • Automated: Route it and track it
  • AI reads and drafts: Sort each one by cause
  • AI reads and drafts: Spot trends each quarter
  • Your team decides: Agree the fix and root cause
  • Your team decides: Confirm it is closed

Passes on: each finding raised as an NCR, with its root cause and owner

06Spot repeat defects from non-conformance and rework records

  • AI reads and drafts: Read each defect note
  • AI reads and drafts: Link it to product and station
  • Automated: Work out the cost
  • Your team decides: Confirm the root cause
  • Your team decides: Agree the fix
  • Automated: Track if the fix works

Passes on: the findings set against past NCRs, so repeats show up

07Prepare the evidence for ISO 9001, 14001 and 45001 audits

  • AI reads and drafts: Map each clause to evidence
  • Automated: Check records are in date
  • Automated: List open actions and gaps
  • Automated: Compile the pack
  • Your team decides: Answer the auditor
  • Your team decides: Sign off the pack

Ends with: the proof of each fix, packed for the auditor

16automated13by AI12decided by your team

Before, by hand

Get the records ready

1Keep FPC records ready
2Chart the test results
3Match certs to deliveries
4Update the training matrix

Raise and close findings

5Raise and close NCRs
6Spot repeat defects
7Prepare for the audit

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Get the records ready

1Keep FPC records ready

AI reads and drafts: Index records to FPC clauses

Automated: Check dates and frequencies

Automated: List gaps and expired items

Automated: Build the audit pack

Your team decides: Fill the gaps

Your team decides: Sign the DoP

Passes on: the FPC records, gathered and checked for gaps, EN 1090 too

2Chart the test results

Automated: Plot results on control charts

Automated: Apply the trend rules

Automated: Flag drift early

AI reads and drafts: Link drift to source or mix

AI reads and drafts: Draft the monthly summary

Your team decides: Decide on any drifting product

Passes on: a chart of test results, with any drift to the limits explained

3Match certs to deliveries

AI reads and drafts: Read each certificate

AI reads and drafts: Match it to order and batch

AI reads and drafts: Flag missing or wrong certs

Automated: File the linked records

Your team decides: Hold or release the material

Passes on: each delivery in the sample, matched to its cert

4Update the training matrix

AI reads and drafts: Read each card and certificate

Automated: Update the matrix

Automated: Send expiry reminders

Automated: List training gaps

Your team decides: Check cards are real

Your team decides: Book the training

Passes on: a check that all your staff are trained and in date

Raise and close findings

5Raise and close NCRs

AI reads and drafts: Draft the NCR from photos and notes

Automated: Route it and track it

AI reads and drafts: Sort each one by cause

AI reads and drafts: Spot trends each quarter

Your team decides: Agree the fix and root cause

Your team decides: Confirm it is closed

Passes on: each finding raised as an NCR, with its root cause and owner

6Spot repeat defects

AI reads and drafts: Read each defect note

AI reads and drafts: Link it to product and station

Automated: Work out the cost

Your team decides: Confirm the root cause

Your team decides: Agree the fix

Automated: Track if the fix works

Passes on: the findings set against past NCRs, so repeats show up

7Prepare for the audit

AI reads and drafts: Map each clause to evidence

Automated: Check records are in date

Automated: List open actions and gaps

Automated: Compile the pack

Your team decides: Answer the auditor

Your team decides: Sign off the pack

Ends with: the proof of each fix, packed for the auditor

16automated

13by AI

12decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.