Draft commissioning reports from BMS trend data and test sheets
We take off your hands: writing up each commissioning report. Pulling it from the BMS trend logs and test sheets. Adding the balancing results and witness records.
You get: a draft report with charts and pass or fail tables. A list of open issues. Your engineer checks and signs it.
Get a price for thisOr check first: Are we ready for AI?
The problem
Our commissioning engineers spend more time on reports. Less of it goes on the commissioning.
How it works
What comes in
- Trend exports from your building controls
- Your test sheets
- The specification and how the controls should run
- Your witness records
What AI does
It reads the trend data. It checks it against the set points and expected sequences. It draws charts and pass or fail tables. It drafts the written findings.
What you get
- A draft commissioning report
- A list of outstanding issues
Who signs it off
Your commissioning engineer checks the results. Then they sign the report off.
What it needs to work
- Trend data exported from your building controls, such as Trend, Tridium or Schneider
- Your report template
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?