Built Logic

See what AI can do

Employer's requirements to design and build tender recommendation

We take off your hands: drafting the employer's requirements. Running the tender and the queries on it. Checking each contractor's proposals. Holding them up to what you asked for.

You get: draft requirements from your client's standards. Each bid checked against them. A price and design report for your QS to sign.

Get a price for this

Or check first: Are we ready for AI?

The problem

On design and build projects, we sign the contract. Then we find out the contractor priced something else.

How the steps join up

It starts when: the client picks design and build as the contract for the scheme.

  1. Draft employer's requirements from the company's standard specification and the scheme details

    Your team checks and decides at this step.

  2. Assemble the employer's tender documents for a main contract

  3. Log bidders' tender queries and draft answers to issue equally to all bidders

  4. Compare design and build proposals against the employer's requirements

  5. Analyse returned main contractor tenders and draft the tender report

    Your team checks and decides at this step.

What you end up with: Employer's requirements drafted from the client's standards. A complete tender issued. Queries answered equally for all bidders. Each contractor's proposals checked against the requirements. A tender report weighing design compliance as well as price.

Who signs it off: Your employer's agent approves the requirements. Your QS signs the tender report. Then the client decides.

What it needs to work

  • The client's standard specification or design guide
  • Drawings at tender stage

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders
  • Surveyors and cost consultants

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Employer's requirements to design and build tender recommendation

Before, by hand

Write and issue

Compare and report

01Draft employer's requirements from the company's standard specification and the scheme details

  • Start from your standard spec
  • Add the scheme details
  • Flag conflicts and gaps
  • Finalise the draft
  • Have advisers check legal terms
  • Approve the ERs

02Assemble the employer's tender documents for a main contract

  • Fill templates from job data
  • Check the documents agree
  • List what is missing
  • Check the pack
  • Approve the contract choices

03Log bidders' tender queries and draft answers to issue equally to all bidders

  • Log each query with no names
  • Group the same questions
  • Draft answers from the documents
  • Approve every answer
  • Send each answer to all bidders
  • Approve any extra time

04Compare design and build proposals against the employer's requirements

  • Pull spec items from each one
  • Line them up side by side
  • List each gap and how serious
  • Draft clarification questions
  • Judge what you can accept
  • Agree the questions

05Analyse returned main contractor tenders and draft the tender report

  • Read prices from each tender
  • Check the sums
  • Compare line by line
  • Price the qualifications
  • Draft the report
  • Sign the recommendation

29tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Write and issue

Compare and report

01Draft employer's requirements from the company's standard specification and the scheme details

  • Automated: Start from your standard spec
  • AI reads and drafts: Add the scheme details
  • AI reads and drafts: Flag conflicts and gaps
  • Your team decides: Finalise the draft
  • Your team decides: Have advisers check legal terms
  • Your team decides: Approve the ERs

Passes on: draft ERs from the client's standard spec, with a change and gap list

02Assemble the employer's tender documents for a main contract

  • Automated: Fill templates from job data
  • AI reads and drafts: Check the documents agree
  • AI reads and drafts: List what is missing
  • Your team decides: Check the pack
  • Your team decides: Approve the contract choices

Passes on: the tender pack, with a list of where the papers don't agree

03Log bidders' tender queries and draft answers to issue equally to all bidders

  • Automated: Log each query with no names
  • AI reads and drafts: Group the same questions
  • AI reads and drafts: Draft answers from the documents
  • Your team decides: Approve every answer
  • Automated: Send each answer to all bidders
  • Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

04Compare design and build proposals against the employer's requirements

  • AI reads and drafts: Pull spec items from each one
  • AI reads and drafts: Line them up side by side
  • AI reads and drafts: List each gap and how serious
  • AI reads and drafts: Draft clarification questions
  • Your team decides: Judge what you can accept
  • Your team decides: Agree the questions

Passes on: each bid set against the ERs in a grid, with draft questions

05Analyse returned main contractor tenders and draft the tender report

  • AI reads and drafts: Read prices from each tender
  • Automated: Check the sums
  • AI reads and drafts: Compare line by line
  • AI reads and drafts: Price the qualifications
  • AI reads and drafts: Draft the report
  • Your team decides: Sign the recommendation

Ends with: a draft tender report that weighs design as well as price

5automated14by AI10decided by your team

Before, by hand

Write and issue

1Draft the ERs
2Build the tender pack
3Answer bidder queries

Compare and report

4Compare the proposals
5Draft the tender report

29tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Write and issue

1Draft the ERs

Automated: Start from your standard spec

AI reads and drafts: Add the scheme details

AI reads and drafts: Flag conflicts and gaps

Your team decides: Finalise the draft

Your team decides: Have advisers check legal terms

Your team decides: Approve the ERs

Passes on: draft ERs from the client's standard spec, with a change and gap list

2Build the tender pack

Automated: Fill templates from job data

AI reads and drafts: Check the documents agree

AI reads and drafts: List what is missing

Your team decides: Check the pack

Your team decides: Approve the contract choices

Passes on: the tender pack, with a list of where the papers don't agree

3Answer bidder queries

Automated: Log each query with no names

AI reads and drafts: Group the same questions

AI reads and drafts: Draft answers from the documents

Your team decides: Approve every answer

Automated: Send each answer to all bidders

Your team decides: Approve any extra time

Passes on: each query logged, and one answer drafted to send to all bidders

Compare and report

4Compare the proposals

AI reads and drafts: Pull spec items from each one

AI reads and drafts: Line them up side by side

AI reads and drafts: List each gap and how serious

AI reads and drafts: Draft clarification questions

Your team decides: Judge what you can accept

Your team decides: Agree the questions

Passes on: each bid set against the ERs in a grid, with draft questions

5Draft the tender report

AI reads and drafts: Read prices from each tender

Automated: Check the sums

AI reads and drafts: Compare line by line

AI reads and drafts: Price the qualifications

AI reads and drafts: Draft the report

Your team decides: Sign the recommendation

Ends with: a draft tender report that weighs design as well as price

5automated

14by AI

10decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.