Built Logic

See what AI can do

Estimate the Building Safety Levy on each scheme

We take off your hands: working out the levy on each scheme. Using the floor areas and the council's rate. Taking off the brownfield discount and any exemptions.

You get: a levy estimate for each scheme. It lists what it assumes and flags timing. Your finance director confirms it.

Get a price for this

Or check first: Are we ready for AI?

The problem

We know there's a new levy. We don't know what it will cost on each site.

How it works

  1. What comes in

    • Schedules of floor areas
    • The site history, to show whether it is brownfield
    • The levy rates published by your council
    • Application dates
  2. What AI does

    It works out the chargeable floor space. It applies the rates, discounts and exemptions. It records the estimate in your cash flow.

  3. What you get

    • A levy estimate for each scheme, with its assumptions and flags
  4. Who signs it off

    Your finance director confirms the estimate. So does your technical manager. It's the council that issues the actual charge.

What it needs to work

  • The final regulations
  • The council's published rates
  • Accurate schedules of gross internal floor area

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Site layout to appraisal build budget

Before, by hand

Set the base costs

Price the ground

Add levies and finish

01Keep the appraisal assumptions library updated from the company's completed schemes

  • Work out real rates from past schemes
  • Compare them with what you assumed
  • Show where you were too hopeful
  • Suggest new figures
  • Approve the changes

02Produce an early build cost budget for a site appraisal

  • Pick past schemes that match
  • Adjust for date, place and spec
  • Build the budget from them
  • Prompt for abnormal costs
  • Check the budget
  • Decide on the appraisal

03Work out foundation depths for plots near trees

  • Measure each tree to each plot
  • Apply the depth rules
  • Build the depth schedule
  • List plots out of range
  • Check and sign the depths
  • Design plots beyond the rules

04Plan earthworks mass haul: which cut goes to which fill, when, and what is surplus

  • Match cut to fill by distance
  • Allow for timing and stockpiles
  • Build the haul schedule
  • Forecast surplus or import
  • Set limits and approve the plan
  • Judge which material is fit

05Track policy costs per scheme and update appraisals when the rules change

  • Apply each rule to each scheme
  • Work out the costs
  • Flag schemes a change hits
  • Draft the impact notes
  • Confirm which rules apply
  • Update the appraisals

This step06Estimate the Building Safety Levy on each scheme

  • Work out chargeable floor area
  • Check if the site is brownfield
  • Apply rates and discounts
  • Add it to the cash flow
  • Confirm the estimate

07Prepare a first-draft development appraisal

  • Put each input into the model
  • Fill gaps with your standard figures
  • Flag which figures are defaults
  • Work out land value and margin
  • Check every assumption
  • Set the bid

40tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Set the base costs

Price the ground

Add levies and finish

01Keep the appraisal assumptions library updated from the company's completed schemes

  • Automated: Work out real rates from past schemes
  • Automated: Compare them with what you assumed
  • AI reads and drafts: Show where you were too hopeful
  • AI reads and drafts: Suggest new figures
  • Your team decides: Approve the changes

Passes on: your library of figures, kept up to date from the schemes you built

02Produce an early build cost budget for a site appraisal

  • AI reads and drafts: Pick past schemes that match
  • AI reads and drafts: Adjust for date, place and spec
  • Automated: Build the budget from them
  • Automated: Prompt for abnormal costs
  • Your team decides: Check the budget
  • Your team decides: Decide on the appraisal

Passes on: an early build budget for this mix, from your past schemes

03Work out foundation depths for plots near trees

  • Automated: Measure each tree to each plot
  • Automated: Apply the depth rules
  • Automated: Build the depth schedule
  • Automated: List plots out of range
  • Your team decides: Check and sign the depths
  • Your team decides: Design plots beyond the rules

Passes on: how deep the footings go near trees, from the tree survey and soil tests

04Plan earthworks mass haul: which cut goes to which fill, when, and what is surplus

  • Automated: Match cut to fill by distance
  • Automated: Allow for timing and stockpiles
  • Automated: Build the haul schedule
  • Automated: Forecast surplus or import
  • Your team decides: Set limits and approve the plan
  • Your team decides: Judge which material is fit

Passes on: a mass haul plan, showing what is spare or must be brought in

05Track policy costs per scheme and update appraisals when the rules change

  • Automated: Apply each rule to each scheme
  • Automated: Work out the costs
  • Automated: Flag schemes a change hits
  • AI reads and drafts: Draft the impact notes
  • Your team decides: Confirm which rules apply
  • Your team decides: Update the appraisals

Passes on: the policy costs for the scheme, such as CIL, Section 106 and net gain

This step06Estimate the Building Safety Levy on each scheme

  • Automated: Work out chargeable floor area
  • AI reads and drafts: Check if the site is brownfield
  • Automated: Apply rates and discounts
  • Automated: Add it to the cash flow
  • Your team decides: Confirm the estimate

Passes on: what the Building Safety Levy will be, from the floor area and rate

07Prepare a first-draft development appraisal

  • Automated: Put each input into the model
  • Automated: Fill gaps with your standard figures
  • Automated: Flag which figures are defaults
  • Automated: Work out land value and margin
  • Your team decides: Check every assumption
  • Your team decides: Set the bid

Ends with: the appraisal with a build budget from your own schemes, not a guess

22automated6by AI12decided by your team

Before, by hand

Set the base costs

1Learn from past schemes
2Set the build budget

Price the ground

3Set foundation depths
4Plan the mass haul

Add levies and finish

5Track policy costs
6Estimate the levyThis step
7Draft the appraisal

40tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Set the base costs

1Learn from past schemes

Automated: Work out real rates from past schemes

Automated: Compare them with what you assumed

AI reads and drafts: Show where you were too hopeful

AI reads and drafts: Suggest new figures

Your team decides: Approve the changes

Passes on: your library of figures, kept up to date from the schemes you built

2Set the build budget

AI reads and drafts: Pick past schemes that match

AI reads and drafts: Adjust for date, place and spec

Automated: Build the budget from them

Automated: Prompt for abnormal costs

Your team decides: Check the budget

Your team decides: Decide on the appraisal

Passes on: an early build budget for this mix, from your past schemes

Price the ground

3Set foundation depths

Automated: Measure each tree to each plot

Automated: Apply the depth rules

Automated: Build the depth schedule

Automated: List plots out of range

Your team decides: Check and sign the depths

Your team decides: Design plots beyond the rules

Passes on: how deep the footings go near trees, from the tree survey and soil tests

4Plan the mass haul

Automated: Match cut to fill by distance

Automated: Allow for timing and stockpiles

Automated: Build the haul schedule

Automated: Forecast surplus or import

Your team decides: Set limits and approve the plan

Your team decides: Judge which material is fit

Passes on: a mass haul plan, showing what is spare or must be brought in

Add levies and finish

5Track policy costs

Automated: Apply each rule to each scheme

Automated: Work out the costs

Automated: Flag schemes a change hits

AI reads and drafts: Draft the impact notes

Your team decides: Confirm which rules apply

Your team decides: Update the appraisals

Passes on: the policy costs for the scheme, such as CIL, Section 106 and net gain

6Estimate the levyThis step

Automated: Work out chargeable floor area

AI reads and drafts: Check if the site is brownfield

Automated: Apply rates and discounts

Automated: Add it to the cash flow

Your team decides: Confirm the estimate

Passes on: what the Building Safety Levy will be, from the floor area and rate

7Draft the appraisal

Automated: Put each input into the model

Automated: Fill gaps with your standard figures

Automated: Flag which figures are defaults

Automated: Work out land value and margin

Your team decides: Check every assumption

Your team decides: Set the bid

Ends with: the appraisal with a build budget from your own schemes, not a guess

22automated

6by AI

12decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.