Higher-risk building gateways and golden thread
We take off your hands: checking the design and test evidence is all there before each gateway submission. Keeping the golden thread up to date.
You get: design packs checked before each gateway. Test proof matched to each part. The golden thread kept up to date.
Get a price for thisOr check first: Are we ready for AI?
The problem
Our gateway submissions keep getting held up. Some of the information is missing.
What is in this package
- Record fire-stopping evidence for every penetration and check nothing is closed up without it
- Prepare task-specific RAMS for review
- Assemble and check the Gateway 3 completion certificate application
- Put together the building control pack as test results come in
- Keep the golden thread for a higher-risk building complete as you build
- Assemble facade technical submissions with matching test evidence
- Build the design responsibility matrix and flag gaps and overlaps
- Run mandatory occurrence reporting on a higher-risk building
- Raise NCRs from site, find the root causes and track them to close
- Draft Building Safety Act competence evidence for main contractors
13 more parts, which a call confirms.
We price a whole package as one build (our rule). A call confirms it.
What it needs to work
- Your design and specification documents
- Your test certificates
- A shared project document store
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?