Built Logic

See what AI can do

Keep the inspection renewal calendar full and rebook clients before certificates expire

We take off your hands: chasing each client to book their next test or inspection. Doing it before the certificate runs out.

You get: a list of live and lost renewals, plus booked visits. Your team signs off the wording first.

Get a price for this

Or check first: Are we ready for AI?

The problem

We lose renewals. It's just because nobody chased them.

How it works

  1. What comes in

    • Your certificate register with due dates
    • Client contacts
    • When your engineers are free
  2. What AI does

    It lists what is due. It sends approved reminders with booking options. It records replies and books the visits.

  3. What you get

    • A list of renewals in progress
    • Booked visits
    • A list of lost or unconfirmed renewals, with reasons
  4. Who signs it off

    Your administrator signs off the wording. They deal with any reply that needs a person to judge.

What it needs to work

  • Reliable due dates in your certificate or project software
  • Client messages you have signed off

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Fire alarm service visit to logbook entry and remedial quote

Before, by hand

Book and brief

Visit and report

Quote and chase

This step01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • List what falls due
  • Approve the reminder wording
  • Send reminders with booking slots
  • Log each reply
  • Book the job in
  • Handle tricky replies

02Give each engineer a short brief on the site and asset before the visit

  • Pull the site and asset history
  • Sum up history and site rules
  • Send the brief to the phone
  • Do the site safety checks

03Produce fire alarm service visit reports and logbook entries to BS 5839-1

  • Build the visit report
  • Track which devices were tested
  • Log variations and defects
  • Draft the log book entry
  • Confirm findings and sign

04Find the causes of unwanted fire and intruder alarms from system event logs

  • Read the panel event logs
  • Group the unwanted alarms
  • Link them to devices
  • Draft findings and a quote
  • Confirm the cause on site

05Check completed job sheets for gaps before they reach the customer

  • Check every field is filled
  • Check readings are in range
  • Match assets to the register
  • Flag defects with no next step
  • Release or return each sheet
  • Set the rules

06Turn defects found on service visits into priced remedial quotes

  • Group defects by site
  • Draft the scope lines
  • Price parts and labour from rates
  • Attach the photos
  • Check scope and price
  • Decide what to send

07Chase unanswered remedial quotes and track which ones are won

  • Set a follow-up for each quote
  • Draft the chase emails
  • Approve each message
  • Match replies to quotes
  • Track which quotes are won
  • Sign any formal safety letter

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Book and brief

Visit and report

Quote and chase

This step01Keep the inspection renewal calendar full and rebook clients before certificates expire

  • Automated: List what falls due
  • Your team decides: Approve the reminder wording
  • Automated: Send reminders with booking slots
  • Automated: Log each reply
  • Automated: Book the job in
  • Your team decides: Handle tricky replies

Passes on: the client booked in again before the service runs out

02Give each engineer a short brief on the site and asset before the visit

  • Automated: Pull the site and asset history
  • AI reads and drafts: Sum up history and site rules
  • Automated: Send the brief to the phone
  • Your team decides: Do the site safety checks

Passes on: a brief with the system history, zone plan and access rules

03Produce fire alarm service visit reports and logbook entries to BS 5839-1

  • Automated: Build the visit report
  • Automated: Track which devices were tested
  • Automated: Log variations and defects
  • AI reads and drafts: Draft the log book entry
  • Your team decides: Confirm findings and sign

Passes on: the report and logbook entry, drafted to BS 5839-1 from the notes

04Find the causes of unwanted fire and intruder alarms from system event logs

  • AI reads and drafts: Read the panel event logs
  • AI reads and drafts: Group the unwanted alarms
  • AI reads and drafts: Link them to devices
  • AI reads and drafts: Draft findings and a quote
  • Your team decides: Confirm the cause on site

Passes on: the cause of each unwanted alarm, from the panel log

05Check completed job sheets for gaps before they reach the customer

  • Automated: Check every field is filled
  • Automated: Check readings are in range
  • Automated: Match assets to the register
  • AI reads and drafts: Flag defects with no next step
  • Your team decides: Release or return each sheet
  • Your team decides: Set the rules

Passes on: the job sheet checked so no reading, photo or sign-off is missing

06Turn defects found on service visits into priced remedial quotes

  • Automated: Group defects by site
  • AI reads and drafts: Draft the scope lines
  • Automated: Price parts and labour from rates
  • Automated: Attach the photos
  • Your team decides: Check scope and price
  • Your team decides: Decide what to send

Passes on: a priced quote for each fault and each thing you advise

07Chase unanswered remedial quotes and track which ones are won

  • Automated: Set a follow-up for each quote
  • AI reads and drafts: Draft the chase emails
  • Your team decides: Approve each message
  • AI reads and drafts: Match replies to quotes
  • Automated: Track which quotes are won
  • Your team decides: Sign any formal safety letter

Ends with: quotes with no reply chased, and a formal letter if a fault is unsafe

17automated10by AI11decided by your team

Before, by hand

Book and brief

1Book the renewalsThis step
2Brief the engineer

Visit and report

3Write the service report
4Find false alarm causes
5Check the job sheets

Quote and chase

6Quote the remedials
7Chase the quotes

38tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Book and brief

1Book the renewalsThis step

Automated: List what falls due

Your team decides: Approve the reminder wording

Automated: Send reminders with booking slots

Automated: Log each reply

Automated: Book the job in

Your team decides: Handle tricky replies

Passes on: the client booked in again before the service runs out

2Brief the engineer

Automated: Pull the site and asset history

AI reads and drafts: Sum up history and site rules

Automated: Send the brief to the phone

Your team decides: Do the site safety checks

Passes on: a brief with the system history, zone plan and access rules

Visit and report

3Write the service report

Automated: Build the visit report

Automated: Track which devices were tested

Automated: Log variations and defects

AI reads and drafts: Draft the log book entry

Your team decides: Confirm findings and sign

Passes on: the report and logbook entry, drafted to BS 5839-1 from the notes

4Find false alarm causes

AI reads and drafts: Read the panel event logs

AI reads and drafts: Group the unwanted alarms

AI reads and drafts: Link them to devices

AI reads and drafts: Draft findings and a quote

Your team decides: Confirm the cause on site

Passes on: the cause of each unwanted alarm, from the panel log

5Check the job sheets

Automated: Check every field is filled

Automated: Check readings are in range

Automated: Match assets to the register

AI reads and drafts: Flag defects with no next step

Your team decides: Release or return each sheet

Your team decides: Set the rules

Passes on: the job sheet checked so no reading, photo or sign-off is missing

Quote and chase

6Quote the remedials

Automated: Group defects by site

AI reads and drafts: Draft the scope lines

Automated: Price parts and labour from rates

Automated: Attach the photos

Your team decides: Check scope and price

Your team decides: Decide what to send

Passes on: a priced quote for each fault and each thing you advise

7Chase the quotes

Automated: Set a follow-up for each quote

AI reads and drafts: Draft the chase emails

Your team decides: Approve each message

AI reads and drafts: Match replies to quotes

Automated: Track which quotes are won

Your team decides: Sign any formal safety letter

Ends with: quotes with no reply chased, and a formal letter if a fault is unsafe

17automated

10by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.