We take off your hands: working out who goes where next week, by skill and card. Flagging clashes and gaps.

You get: a draft gang plan by project, with clashes flagged. A labour forecast. Your contracts manager signs it off.

Get a price for this

Or check first: Are we ready for AI?

The problem

Every Friday we juggle who goes where next week. Monday still goes wrong.

How it works

  1. What comes in

    • Your list of live projects
    • The main contractors' programmes and call-offs
    • Your operatives with their skills, CSCS or CISRS cards and holidays
    • This week's plan
    • Site addresses
  2. What AI does

    It matches crews asked for to free operatives by skill, card and place. It drafts the plan. It highlights clashes and gaps. It forecasts demand against headcount for four to eight weeks.

  3. What you get

    • A draft weekly gang plan for each project
    • A list of gaps and clashes
    • Messages to operatives once the plan is approved
    • A forecast of labour demand
  4. Who signs it off

    Your contracts manager decides the final plan. They decide who covers any gap. That includes any use of agency labour.

What it needs to work

  • An up-to-date operative list with skills and card expiry dates
  • Project dates from programmes or call-offs, which main contractors change often

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Main contractors
  • Specialist subcontractors

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Timber frame or CLT plot from delivery to recorded and paid frame

Before, by hand

Plan the gang and loads

Build and check

Pay the gang

This step01Plan next week's gangs, scaffold and access across live projects

  • Match crews by skill, card and area
  • Draft the weekly plan
  • Flag clashes and gaps
  • Forecast labour demand
  • Decide the plan and cover
  • Message operatives once approved

02Plan deliveries and loads to match the site installation order

  • Group units by install order
  • Fit loads to vehicle limits
  • Check each unit is ready
  • Make the delivery notes
  • Confirm the load plan
  • Check load security

03Check the site against the insurer's fire prevention code and keep the evidence

  • Build the fire checklist
  • Schedule the inspections
  • Link permits and photos
  • Report the gaps
  • Inspect and sign
  • Confirm the fire plan

04Record timber frame and CLT erection checks plot by plot

  • Issue the check list per plot
  • Collect ticks, readings and photos
  • Compare readings with the limits
  • Flag areas not ready to release
  • Sign each location
  • Decide on any non-conformance

05Monitor timber panel moisture during construction and warn before wet panels are closed in

  • Map readings to panels
  • Compare with the limits
  • Send alerts with next steps
  • Log readings and actions
  • Set the moisture limits
  • Decide when to close in

06Record cavity barrier and fixing checks with photos before they are covered

  • Check each photo shows the detail
  • Track which bays are done
  • Alert on missing bays
  • Inspect and sign each bay
  • Build the inspection log

07Calculate price-work payments for drylining, plastering, tiling, bricklaying, groundworks, frame and glazing gangs from approved measured work

  • Price each gang claim
  • Check totals against each area
  • Flag claims over the total
  • Apply the deductions
  • Build the pay statements
  • Approve the pay

08Prepare payment applications using project records

  • Pull values from the registers
  • Carry forward the totals
  • Attach evidence to each line
  • List items with no support
  • Check measure and value
  • Submit the application

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Plan the gang and loads

Build and check

Pay the gang

This step01Plan next week's gangs, scaffold and access across live projects

  • Automated: Match crews by skill, card and area
  • Automated: Draft the weekly plan
  • Automated: Flag clashes and gaps
  • Automated: Forecast labour demand
  • Your team decides: Decide the plan and cover
  • Automated: Message operatives once approved

Passes on: the gang and crane crew for the plot, with cards and skills checked

02Plan deliveries and loads to match the site installation order

  • Automated: Group units by install order
  • Automated: Fit loads to vehicle limits
  • Automated: Check each unit is ready
  • Automated: Make the delivery notes
  • Your team decides: Confirm the load plan
  • Your team decides: Check load security

Passes on: panel loads in the order they go up, to match the crane slots

03Check the site against the insurer's fire prevention code and keep the evidence

  • Automated: Build the fire checklist
  • Automated: Schedule the inspections
  • Automated: Link permits and photos
  • Automated: Report the gaps
  • Your team decides: Inspect and sign
  • Your team decides: Confirm the fire plan

Passes on: fire checks for the frame stage, to the STA 16 Steps and the insurer's code

04Record timber frame and CLT erection checks plot by plot

  • Automated: Issue the check list per plot
  • Automated: Collect ticks, readings and photos
  • Automated: Compare readings with the limits
  • Automated: Flag areas not ready to release
  • Your team decides: Sign each location
  • Your team decides: Decide on any non-conformance

Passes on: checks by plot or floor: fixings, plumb, hold down and photos

05Monitor timber panel moisture during construction and warn before wet panels are closed in

  • Automated: Map readings to panels
  • Automated: Compare with the limits
  • Automated: Send alerts with next steps
  • Automated: Log readings and actions
  • Your team decides: Set the moisture limits
  • Your team decides: Decide when to close in

Passes on: how damp each panel is, set against the limits in the plan

06Record cavity barrier and fixing checks with photos before they are covered

  • AI reads and drafts: Check each photo shows the detail
  • Automated: Track which bays are done
  • Automated: Alert on missing bays
  • Your team decides: Inspect and sign each bay
  • Automated: Build the inspection log

Passes on: a photo of each cavity barrier and fire break before it is closed in

07Calculate price-work payments for drylining, plastering, tiling, bricklaying, groundworks, frame and glazing gangs from approved measured work

  • Automated: Price each gang claim
  • Automated: Check totals against each area
  • Automated: Flag claims over the total
  • Automated: Apply the deductions
  • Automated: Build the pay statements
  • Your team decides: Approve the pay

Passes on: price-work pay for the gangs, from plots signed off

08Prepare payment applications using project records

  • Automated: Pull values from the registers
  • Automated: Carry forward the totals
  • AI reads and drafts: Attach evidence to each line
  • AI reads and drafts: List items with no support
  • Your team decides: Check measure and value
  • Your team decides: Submit the application

Ends with: the plot stage claim, from the same records as the gang pay

31automated3by AI13decided by your team

Before, by hand

Plan the gang and loads

1Plan next week's gangsThis step
2Plan the loads

Build and check

3Check the fire code
4Record frame checks
5Watch panel moisture
6Record barrier checks

Pay the gang

7Work out gang pay
8Build the application

47tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Plan the gang and loads

1Plan next week's gangsThis step

Automated: Match crews by skill, card and area

Automated: Draft the weekly plan

Automated: Flag clashes and gaps

Automated: Forecast labour demand

Your team decides: Decide the plan and cover

Automated: Message operatives once approved

Passes on: the gang and crane crew for the plot, with cards and skills checked

2Plan the loads

Automated: Group units by install order

Automated: Fit loads to vehicle limits

Automated: Check each unit is ready

Automated: Make the delivery notes

Your team decides: Confirm the load plan

Your team decides: Check load security

Passes on: panel loads in the order they go up, to match the crane slots

Build and check

3Check the fire code

Automated: Build the fire checklist

Automated: Schedule the inspections

Automated: Link permits and photos

Automated: Report the gaps

Your team decides: Inspect and sign

Your team decides: Confirm the fire plan

Passes on: fire checks for the frame stage, to the STA 16 Steps and the insurer's code

4Record frame checks

Automated: Issue the check list per plot

Automated: Collect ticks, readings and photos

Automated: Compare readings with the limits

Automated: Flag areas not ready to release

Your team decides: Sign each location

Your team decides: Decide on any non-conformance

Passes on: checks by plot or floor: fixings, plumb, hold down and photos

5Watch panel moisture

Automated: Map readings to panels

Automated: Compare with the limits

Automated: Send alerts with next steps

Automated: Log readings and actions

Your team decides: Set the moisture limits

Your team decides: Decide when to close in

Passes on: how damp each panel is, set against the limits in the plan

6Record barrier checks

AI reads and drafts: Check each photo shows the detail

Automated: Track which bays are done

Automated: Alert on missing bays

Your team decides: Inspect and sign each bay

Automated: Build the inspection log

Passes on: a photo of each cavity barrier and fire break before it is closed in

Pay the gang

7Work out gang pay

Automated: Price each gang claim

Automated: Check totals against each area

Automated: Flag claims over the total

Automated: Apply the deductions

Automated: Build the pay statements

Your team decides: Approve the pay

Passes on: price-work pay for the gangs, from plots signed off

8Build the application

Automated: Pull values from the registers

Automated: Carry forward the totals

AI reads and drafts: Attach evidence to each line

AI reads and drafts: List items with no support

Your team decides: Check measure and value

Your team decides: Submit the application

Ends with: the plot stage claim, from the same records as the gang pay

31automated

3by AI

13decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.