Plot costs and build cost control

We take off your hands: working out trade payments at each plot stage. Tracking the cost of each plot. Closing out site and subcontract final accounts on time.

You get: a plot cost log at each stage. Trade pay checked to plot rates, with spec savings. Your QS checks it.

Get a price for this

Or check first: Are we ready for AI?

The problem

We only find out what a plot really cost after the site has closed.

What it needs to work

  • Your plot cost data
  • Your trade accounts

If those aren’t in place yet, you’ll hear that before anything gets built.

Who it’s for

  • Developers and housebuilders

What would this cost for your team?

Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.

Get a price for this

Or check first: Are we ready for AI?

How it runs, before and after

Plot stage sign-off to trade payment and plot cost report

Before, by hand

Record the stages

Pay the trades

Report the cost

01Turn site managers' voice notes into plot records, issues and daily reports

  • Write up the voice notes
  • Pull updates for each plot
  • Update the plot records
  • Send actions to each trade
  • Draft the daily report
  • Check it before it is shared

02Track each plot's build stage and publish a weekly plot status

  • Confirm each stage
  • Log stage completions
  • Compare with the plan
  • Forecast plot finish dates
  • Send the weekly plot status
  • Act on late plots

03Calculate subcontractor plot payments from signed-off stages

  • Confirm the stages signed off
  • Work out what is due per plot
  • Apply contras and retention
  • Compare with each application
  • List the differences
  • Approve the payments

04Hold subcontractor payments until insurances and documents are in date

  • Read dates and cover off certificates
  • Check them against the requirements
  • Chase what is missing
  • Flag payments to hold
  • Decide to hold or release

05Issue payment and pay-less notices to subcontractors on time

  • Work out the notice dates
  • Draft each notice
  • Send it for approval
  • Approve each notice and deduction
  • Issue it and log proof

06Recover the cost of defects from the subcontractors responsible

  • Link each defect to its trade
  • Check the subcontract terms
  • Draft the contra-charge notice
  • Attach the evidence
  • Track what is recovered
  • Decide which to raise

07Report build cost per plot and house type against the build budget

  • Pull payments and invoices
  • Split costs across plots
  • Compare with the build budget
  • Flag variances by trade
  • Review the split
  • Explain the variances

08Compare materials ordered with materials needed on each job to spot over-ordering and waste

  • Match orders to budget items
  • Allow for progress on site
  • Flag gaps by item and job
  • Spot patterns across jobs
  • Look into each gap

09Forecast cost to complete and final margin for each package and project

  • Pull costs, orders and progress
  • Forecast cost to complete
  • Compare with the QS forecast
  • Explain each gap
  • Set the final forecast
  • Challenge the forecast

51tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Record the stages

Pay the trades

Report the cost

01Turn site managers' voice notes into plot records, issues and daily reports

  • AI reads and drafts: Write up the voice notes
  • AI reads and drafts: Pull updates for each plot
  • Automated: Update the plot records
  • Automated: Send actions to each trade
  • AI reads and drafts: Draft the daily report
  • Your team decides: Check it before it is shared

Passes on: the stages done, from voice notes, put in the plot records

02Track each plot's build stage and publish a weekly plot status

  • Your team decides: Confirm each stage
  • Automated: Log stage completions
  • Automated: Compare with the plan
  • AI reads and drafts: Forecast plot finish dates
  • Automated: Send the weekly plot status
  • Your team decides: Act on late plots

Passes on: the stage each plot is at, across the site

03Calculate subcontractor plot payments from signed-off stages

  • Your team decides: Confirm the stages signed off
  • Automated: Work out what is due per plot
  • Automated: Apply contras and retention
  • Automated: Compare with each application
  • Automated: List the differences
  • Your team decides: Approve the payments

Passes on: what each trade is owed for stages done, at the plot rate

04Hold subcontractor payments until insurances and documents are in date

  • AI reads and drafts: Read dates and cover off certificates
  • AI reads and drafts: Check them against the requirements
  • Automated: Chase what is missing
  • Automated: Flag payments to hold
  • Your team decides: Decide to hold or release

Passes on: a hold on pay where insurance or papers are out of date

05Issue payment and pay-less notices to subcontractors on time

  • Automated: Work out the notice dates
  • AI reads and drafts: Draft each notice
  • Automated: Send it for approval
  • Your team decides: Approve each notice and deduction
  • Automated: Issue it and log proof

Passes on: payment and pay less notices, sent on time

06Recover the cost of defects from the subcontractors responsible

  • AI reads and drafts: Link each defect to its trade
  • AI reads and drafts: Check the subcontract terms
  • AI reads and drafts: Draft the contra-charge notice
  • Automated: Attach the evidence
  • Automated: Track what is recovered
  • Your team decides: Decide which to raise

Passes on: defect and damage costs charged back to the trade at fault

07Report build cost per plot and house type against the build budget

  • Automated: Pull payments and invoices
  • AI reads and drafts: Split costs across plots
  • Automated: Compare with the build budget
  • Automated: Flag variances by trade
  • Your team decides: Review the split
  • Your team decides: Explain the variances

Passes on: build cost per plot and house type, against the budget

08Compare materials ordered with materials needed on each job to spot over-ordering and waste

  • AI reads and drafts: Match orders to budget items
  • Automated: Allow for progress on site
  • Automated: Flag gaps by item and job
  • AI reads and drafts: Spot patterns across jobs
  • Your team decides: Look into each gap

Passes on: what was ordered set next to what each plot needs

09Forecast cost to complete and final margin for each package and project

  • Automated: Pull costs, orders and progress
  • Automated: Forecast cost to complete
  • AI reads and drafts: Compare with the QS forecast
  • AI reads and drafts: Explain each gap
  • Your team decides: Set the final forecast
  • Your team decides: Challenge the forecast

Ends with: cost to complete and final margin for each site

23automated15by AI13decided by your team

Before, by hand

Record the stages

1Write up voice notes
2Track plot progress

Pay the trades

3Work out plot payments
4Check papers before paying
5Issue the notices
6Recover defect costs

Report the cost

7Cost each plot
8Check what was ordered
9Forecast the final margin

51tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

Record the stages

1Write up voice notes

AI reads and drafts: Write up the voice notes

AI reads and drafts: Pull updates for each plot

Automated: Update the plot records

Automated: Send actions to each trade

AI reads and drafts: Draft the daily report

Your team decides: Check it before it is shared

Passes on: the stages done, from voice notes, put in the plot records

2Track plot progress

Your team decides: Confirm each stage

Automated: Log stage completions

Automated: Compare with the plan

AI reads and drafts: Forecast plot finish dates

Automated: Send the weekly plot status

Your team decides: Act on late plots

Passes on: the stage each plot is at, across the site

Pay the trades

3Work out plot payments

Your team decides: Confirm the stages signed off

Automated: Work out what is due per plot

Automated: Apply contras and retention

Automated: Compare with each application

Automated: List the differences

Your team decides: Approve the payments

Passes on: what each trade is owed for stages done, at the plot rate

4Check papers before paying

AI reads and drafts: Read dates and cover off certificates

AI reads and drafts: Check them against the requirements

Automated: Chase what is missing

Automated: Flag payments to hold

Your team decides: Decide to hold or release

Passes on: a hold on pay where insurance or papers are out of date

5Issue the notices

Automated: Work out the notice dates

AI reads and drafts: Draft each notice

Automated: Send it for approval

Your team decides: Approve each notice and deduction

Automated: Issue it and log proof

Passes on: payment and pay less notices, sent on time

6Recover defect costs

AI reads and drafts: Link each defect to its trade

AI reads and drafts: Check the subcontract terms

AI reads and drafts: Draft the contra-charge notice

Automated: Attach the evidence

Automated: Track what is recovered

Your team decides: Decide which to raise

Passes on: defect and damage costs charged back to the trade at fault

Report the cost

7Cost each plot

Automated: Pull payments and invoices

AI reads and drafts: Split costs across plots

Automated: Compare with the build budget

Automated: Flag variances by trade

Your team decides: Review the split

Your team decides: Explain the variances

Passes on: build cost per plot and house type, against the budget

8Check what was ordered

AI reads and drafts: Match orders to budget items

Automated: Allow for progress on site

Automated: Flag gaps by item and job

AI reads and drafts: Spot patterns across jobs

Your team decides: Look into each gap

Passes on: what was ordered set next to what each plot needs

9Forecast the final margin

Automated: Pull costs, orders and progress

Automated: Forecast cost to complete

AI reads and drafts: Compare with the QS forecast

AI reads and drafts: Explain each gap

Your team decides: Set the final forecast

Your team decides: Challenge the forecast

Ends with: cost to complete and final margin for each site

23automated

15by AI

13decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.

How it runs, before and after

Quarterly build cost review to specification savings

Before, by hand

See the costs

Check the prices

Agree and update

01Report build cost per plot and house type against the build budget

  • Pull payments and invoices
  • Split costs across plots
  • Compare with the build budget
  • Flag variances by trade
  • Review the split
  • Explain the variances

02Compare build cost per house type across sites and tenders to find specification savings

  • Pull budgets, tenders and actuals
  • Line up costs by house type
  • Flag big gaps between sites
  • Trace each gap to spec or rate
  • List ways to save
  • Decide on spec changes

03Track material prices and warn about rises on the materials the company buys most

  • Collect index and supplier prices
  • Read supplier price letters
  • Work out trends for key items
  • Compare with rates in live jobs
  • Send the price alerts
  • Decide how to respond

04Show the company's exposure to material price rises on fixed-price work not yet bought

  • Work out what's not yet bought
  • Apply index moves and scenarios
  • Rank jobs by exposure
  • Suggest what to buy early
  • Decide early buys and positions

05Log value engineering options with their cost, planning and sales impact and record each decision

  • Record each VE option
  • Check it against consent and spec
  • Sum up the impact of each
  • Get planning advice on changes
  • Decide which options to take
  • Record each decision

06Keep the group specification for each brand and region in one place and flag site deviations

  • Hold the spec in one place
  • Log each change
  • Compare orders with the spec
  • Report deviations by site
  • Approve spec changes
  • Decide on each deviation

07Keep house type revisions under control and show which plots use each one

  • Build the house type register
  • Link plots to each revision
  • Report what each change hits
  • List drawings to reissue
  • Approve the revision
  • Decide where it applies

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

See the costs

Check the prices

Agree and update

01Report build cost per plot and house type against the build budget

  • Automated: Pull payments and invoices
  • AI reads and drafts: Split costs across plots
  • Automated: Compare with the build budget
  • Automated: Flag variances by trade
  • Your team decides: Review the split
  • Your team decides: Explain the variances

Passes on: build cost per plot and house type, against the budget

02Compare build cost per house type across sites and tenders to find specification savings

  • Automated: Pull budgets, tenders and actuals
  • AI reads and drafts: Line up costs by house type
  • Automated: Flag big gaps between sites
  • AI reads and drafts: Trace each gap to spec or rate
  • AI reads and drafts: List ways to save
  • Your team decides: Decide on spec changes

Passes on: build cost per house type across sites and tenders, and where to save

03Track material prices and warn about rises on the materials the company buys most

  • Automated: Collect index and supplier prices
  • AI reads and drafts: Read supplier price letters
  • Automated: Work out trends for key items
  • Automated: Compare with rates in live jobs
  • Automated: Send the price alerts
  • Your team decides: Decide how to respond

Passes on: price moves on the materials you buy most

04Show the company's exposure to material price rises on fixed-price work not yet bought

  • Automated: Work out what's not yet bought
  • Automated: Apply index moves and scenarios
  • Automated: Rank jobs by exposure
  • AI reads and drafts: Suggest what to buy early
  • Your team decides: Decide early buys and positions

Passes on: your exposure to price rises on plots not yet bought

05Log value engineering options with their cost, planning and sales impact and record each decision

  • Automated: Record each VE option
  • AI reads and drafts: Check it against consent and spec
  • AI reads and drafts: Sum up the impact of each
  • Your team decides: Get planning advice on changes
  • Your team decides: Decide which options to take
  • Automated: Record each decision

Passes on: VE options with the cost, planning and sales impact of each

06Keep the group specification for each brand and region in one place and flag site deviations

  • Automated: Hold the spec in one place
  • Automated: Log each change
  • AI reads and drafts: Compare orders with the spec
  • Automated: Report deviations by site
  • Your team decides: Approve spec changes
  • Your team decides: Decide on each deviation

Passes on: the savings put in the group spec, and any site that does not match

07Keep house type revisions under control and show which plots use each one

  • Automated: Build the house type register
  • Automated: Link plots to each revision
  • AI reads and drafts: Report what each change hits
  • Automated: List drawings to reissue
  • Your team decides: Approve the revision
  • Your team decides: Decide where it applies

Ends with: the house type library revised, and the sites and plots it hits

20automated10by AI11decided by your team

Before, by hand

See the costs

1Cost each plot
2Compare house type costs

Check the prices

3Track material prices
4Show price exposure

Agree and update

5Log VE options
6Keep the group spec
7Control house type revisions

41tasks, all by hand

After, with automation and AI

AutomatedAI reads and draftsYour team decides

Tap a step to see each task and what it passes on.

See the costs

1Cost each plot

Automated: Pull payments and invoices

AI reads and drafts: Split costs across plots

Automated: Compare with the build budget

Automated: Flag variances by trade

Your team decides: Review the split

Your team decides: Explain the variances

Passes on: build cost per plot and house type, against the budget

2Compare house type costs

Automated: Pull budgets, tenders and actuals

AI reads and drafts: Line up costs by house type

Automated: Flag big gaps between sites

AI reads and drafts: Trace each gap to spec or rate

AI reads and drafts: List ways to save

Your team decides: Decide on spec changes

Passes on: build cost per house type across sites and tenders, and where to save

Check the prices

3Track material prices

Automated: Collect index and supplier prices

AI reads and drafts: Read supplier price letters

Automated: Work out trends for key items

Automated: Compare with rates in live jobs

Automated: Send the price alerts

Your team decides: Decide how to respond

Passes on: price moves on the materials you buy most

4Show price exposure

Automated: Work out what's not yet bought

Automated: Apply index moves and scenarios

Automated: Rank jobs by exposure

AI reads and drafts: Suggest what to buy early

Your team decides: Decide early buys and positions

Passes on: your exposure to price rises on plots not yet bought

Agree and update

5Log VE options

Automated: Record each VE option

AI reads and drafts: Check it against consent and spec

AI reads and drafts: Sum up the impact of each

Your team decides: Get planning advice on changes

Your team decides: Decide which options to take

Automated: Record each decision

Passes on: VE options with the cost, planning and sales impact of each

6Keep the group spec

Automated: Hold the spec in one place

Automated: Log each change

AI reads and drafts: Compare orders with the spec

Automated: Report deviations by site

Your team decides: Approve spec changes

Your team decides: Decide on each deviation

Passes on: the savings put in the group spec, and any site that does not match

7Control house type revisions

Automated: Build the house type register

Automated: Link plots to each revision

AI reads and drafts: Report what each change hits

Automated: List drawings to reissue

Your team decides: Approve the revision

Your team decides: Decide where it applies

Ends with: the house type library revised, and the sites and plots it hits

20automated

10by AI

11decided by your team

An example of how this workflow usually happens. We would tailor it to your company and add or remove tasks based on how you work.