Prepare DNO applications for solar, batteries, heat pumps and EV chargers
We take off your hands: filling in the G98, G99, heat pump and EV charger forms. Checking them for the usual reasons they get rejected.
You get: a draft DNO application with a checklist to run first. A tracker for each one through to approval. Your design engineer approves and sends it.
Get a price for thisOr check first: Are we ready for AI?
The problem
Our DNO applications bounce back. The project sits there and waits.
How it works
What comes in
- Survey data and design
- Equipment data sheets
- Entries from the Energy Networks Association type test register
- The meter number and site plan
What AI does
It fills in the application fields. It gathers the documents. It checks everything is complete. It checks the type test references are right. It tracks status and deadlines.
What you get
- A draft application pack
- A checklist to run before sending
- A tracker of applications
Who signs it off
Your design engineer approves the protection settings. Then they send in the application. It is the network operator who makes the decision.
What it needs to work
- Equipment data
- Access to ENA Connect Direct or your local network operator's portals
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors