Put together the sewer adoption evidence pack for each length
We take off your hands: chasing up the as-built levels, CCTV surveys and test records. Doing it for each length of sewer and each manhole.
You get: an adoption tracker and list of missing files. A pack ready once your engineer checks the data.
Get a price for thisOr check first: Are we ready for AI?
The problem
We finish the drainage. Then it takes months to get the adoption paperwork accepted.
How it works
What comes in
- Your drainage layout with manhole references
- Survey levels and CCTV reports
- Your test certificates
- The water company's requirements
What AI does
It matches each record to a sewer length. It checks the set against the adoption checklist. It then puts the submission together.
What you get
- A tracker of adoption evidence
- A list of missing records
- The submission pack
- Reminders for the end-of-maintenance survey
Who signs it off
Your engineer confirms the as-built data. Then it goes to the water company. The developer or contractor sends it in.
What it needs to work
- Manhole and length references used the same way on site
- The requirements of the water company involved
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
- Developers and housebuilders