Record pressure, air and water tests section by section against the drawing
We take off your hands: keeping test records and gauge photos for each section of pipework, ductwork and drains. Doing it before it's covered up.
You get: a log of tests and what is ready to close up. System certs for the manual. Your supervisor signs each test.
Get a price for thisOr check first: Are we ready for AI?
The problem
At handover we can't always prove each section was tested before it was boxed in.
How it works
What comes in
- Installation drawings with each section marked
- Your test records and gauge photos
- Witness sign-offs
- The test requirements in your specification
What AI does
It records each test against its section. It checks pressures and times against the specification. It shows a live map of what is tested and what is not.
What you get
- A register of tests
- A list of what is ready to close up
- Certificates for each system, ready for the O&M manual
Who signs it off
Your supervisor witnesses each test. Where needed, the main contractor or the client's rep signs too.
What it needs to work
- Sections marked clearly on the drawings
- The test figures from the specification
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?