Report late drawings and design information against the schedule
We take off your hands: checking the information required schedule. Holding it up to what has been issued. Finding what's late.
You get: a report of late drawings and how they hit the programme. Draft notices. Your design manager confirms it.
Get a price for thisOr check first: Are we ready for AI?
The problem
We're always waiting on drawings. We can't prove how late they were.
How it works
What comes in
- Your schedule of information required
- The design programme
- The document register
- Your records of what has been sent
What AI does
It matches what is required to what has been issued. It works out how late each item is. It shows how much spare time is left before it is needed. It drafts the report.
What you get
- A report of late information
- Suggested notices
Who signs it off
Your design manager confirms the report. They decide if any notice should go out.
What it needs to work
- A schedule of information required that is kept up to date
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
- Developers and housebuilders
- Surveyors and cost consultants