Site question to answered RFI and costed change
We take off your hands: answering the site team's questions from the drawings. Drafting RFIs and keeping track of them. Flagging any late design information. Logging each change as it comes.
You get: answers from drawings. Draft RFIs for your project engineer. Changes logged for your PM.
Get a price for thisOr check first: Are we ready for AI?
The problem
Our site team raises RFIs. But the answers are already in the drawings.
How the steps join up
It starts when: the site team has a technical question.
Answer site team questions from the project's own drawings, specification and contract
Check whether a technical question is already answered in the project documents before an RFI is raised
Draft RFIs from site questions and track them to an answer
Your team checks and decides at this step.
Report late drawings and design information against the schedule
Assess the knock-on effects of a design change on programme, cost, orders and other packages
Capture site instructions and track potential variations
What you end up with: Answers to questions already covered in the drawings. Draft RFIs, tracked. A report of late design information. Design changes assessed and logged as changes.
Who signs it off: Your project engineer signs off the RFIs. Your project manager signs off the impact of any change.
What it needs to work
- Up-to-date drawings and specification in one place
If those aren’t in place yet, you’ll hear that before anything gets built.
Who it’s for
- Main contractors
- Specialist subcontractors
What would this cost for your team?
Answer questions about your company and how this work runs today. You see an indicative estimate of the hours back, what that time is worth and the price when you send your details.
Get a price for thisOr check first: Are we ready for AI?